Municipal sites
Ecoproject Ltd. is co-operate for performing of integrated water projects or part of them with following municipalities:
1. Kaloyanovo municipality: Preparation of investment studies and preliminary design for "Wastewater treatment plant of domestic - faeces water".
- the village of Dalgo Pole with population 2000 p.e.
- the village of Zitnica with population 1700 p.e.
- the village of Rajevo Konare with population 1600 p.e.
- the village of Kaloyanovo with population 6000 p.e.
2. Kavarna municipality: project development; sewerage system; inlet collector; wastewater treatment plant.
- the village of Rakovski with population 400 p.e.
3. Svilengrad town - Petko Voivoda quarter: Construction of sewerage system and reconstruction of existing water-main of the area with population 1792 p.e.
4. Tervel municipality: pre-design study and preliminary design for WWTP - Tervel with population 11000p.e. Extension, reconstruction and modernization.
5. Pazardzik municipality - the village of Malo Konare: work design development for a wastewater treatment plant from populated area with 5000 p.e.
6. WWTP Troyan town - II stage - biological stage, work design for the II stage - the Biological stage has been developed together with German company 'Von Nordensköld'
Ecoproject has developed the following parts:
- Construction-mounting part;
- Architecture part;
- Heating, ventilation and air-conditioning;
- Electric part;
- Water-supply and sewerage;
- Translation of the German project and convert it in accordance with bulgarian standards.
7. Dragoman municipality - the village of Gaber: work design for inlet and outlet collector and WWTP for 2000 p.e.
8. Simitli municipality: Preliminary design study and work design for change, reconstruction and extension of the following: street water-main, street channels, construction and rehabilitation of water-supply system; construction of streets and street-lighting.




